Back to top
   Call Me Free Send SMS Send Inquiry

Pre Heating of Welding

Pre Heating of Welding
Send Inquiry
Service Code : PH
Brand Name : Inspection & Testing Engineers
Pre Heating of welding is done before start of welding and along with welding so that the temperature gradient is maintained constant and there is no sudden contraction and expansion of metal before and after welding. Pre Heating also referred to as PH also helps to improve weld ability of steel.


The temperature at which to preheat is determined by the mechanical and physical properties of the metal to be welded and electrode being used. All the data including the initial temperature and interpass temperature is specified in the WPS and has to be followed if desired material characteristics like hardness, weld ability, etc. are to be obtained.


Areas Served :- Delhi, Uttar Pradesh, Haryana, Punjab, Maharashtra, Bihar, Rajasthan, Himachal Pradesh, Uttarakhand, Madhya Pradesh, Jammu & Kashmir, Gujarat, Sikkim, Greater Noida, Ghaziabad, Noida, Nepal, Entire North India and South India, United Arab Emirates, Dubai, Qatar, Saudi Arabia, Africa, Egypt, Bahrain, Oman, etc.


INSPECTION & TESTING ENGINEERS
X


INSPECTION & TESTING ENGINEERS
An NABL & ISO 9001 : 2008 Accredited Lab
Correspondence Address : F 22-23, Site C, Surajpur Industrial Area, UPSIDC, Greater Noida - 201308, Uttar Pradesh, India
Phone :+918037304129
Mr Ashok Kumar Pawar (Managing Director)
Mobile :918037304129
Trust Stamp

Lab Address :
ITE Lab Division
Barola, Sector - 49 Noida, Uttar Pradesh - 201301

Industrial Facility Address :
Inspection & Testing Engineers
F-22 & F-23, Site - C, UPSIDC, Surajpur Industrial Area, Surajpur, Greater Noida, Uttar Pradesh
   Call Me Free Send SMS Send Inquiry